Blue Thorn Technology
Unit A1 | The Icehouse | 180-182 Fazeley Street | Birmingham | B5 5SE
Client Login

Animation Case Studies

Client: Axima Building Services (Cofeley)

Project: BP3 Chiller Animation (070)

Completed: March 2007

BP3 Chiller Animation

This was an animation for a presentation done by Axima to win a contract.

It detailed the way in which Axima were planning to construct a frame to it a chiller on and then 'modularise' them so mnay chillers could be added to the circuit and placed side by side.

It illustrated the way in which the frame was created and showed the  method they would be positioned into the chiller compound and how the final array would look.

Unfortunately we are limited to the quality we can display over the internet. Note that this flv animation runs about a third slower than proper speed.